WDB engineer closed
Havoc in haor: Sunamganj WDB engineer withdrawn
An executive engineer of Water Development Board in Sunamganj is withdrawn amid allegations of corruption in the construction and repairing of the embankment surrounding the haor areas.
15 April 2017, 14:21 PM